Regulatory Filings
Maritime Electric is a Public Utility regulated by the Island Regulatory and Appeals Commission (IRAC) under the Electric Power Act and the Renewable Energy Act. Electricity rates and directives over all operations and expenditures are subject to IRAC's approval.
IRAC provides regulatory oversight of our operations to ensure compliance with applicable legislation. Maritime Electric is mandated to provide documentation to IRAC to justify costs in administration, operations, and electricity purchase and sale.
Below are recent IRAC Applications that have been filed by Maritime Electric.
Regulatory Filings
2023 Capital Budget Application
2023 General Rate Application
Energy Cost Adjustment Mechanism (ECAM) Collection Rate Adjustment
- Order UE22-01 – February 16, 2022
- Notice of Application – January 5, 2022
- Application – MECL – ECAM Rate Increase – December 17, 2021
Open Access Transmission Tariff
2022 Annual Capital Budget
Combustion Turbine #3 Equipment Building and Long-term Plan for Energy System Utilization at the CTGS
Stage 1 Rate Design Changes
- Application & Evidence of Maritime Electric Company, Limited – June 8, 2021
- UE22503 – MECL – Rate Design Study – June 30, 2020 (Public Consultation to be scheduled)
Comprehensive Review of the Energy Cost Adjustment Mechanism
Archive
Archived Applications and Filings
2021 Annual Capital Budget
- Application & Evidence of Maritime Electric Company, Limited – August 6, 2020
- Comments received from Roger King (October 30, 2020)
- Updated Application & Evidence of Maritime Electric Company, Limited – February 1, 2021
- Notice of Application – MECL 2021 Annual Capital Budget
- MECL Response to Questions from Roger King – March 5, 2021
- MECL Response to Additional Clarification Questions from Roger King – March 9, 2021
- Comments from Roger King to Commission – March 17, 2021
- Interrogatories from Commission Re: 2019 Capital Budget Variance Report – September 8, 2020
- MECL Response to Interrogatories Re: 2019 Capital Budget Variance Report – February 25, 2021
- Interrogatories from Commission Re: 2021 Capital Budget Application – March 30, 2021
- MECL Responses to Interrogatories Re: 2021 Capital Budget Application – April 22, 2021
Supplemental Budget Request – Electric Vehicle Chargers
- Comments received from Roger King re: EV Charging Stations (October 30, 2020)
- Order No. UE20-05 – October 4, 2020
- Application & Evidence of Maritime Electric Company, Limited – filed June 30, 2020
- Interrogatories of Commission Staff – filed August 11, 2020
- MECL Responses to Interrogatories from Commission Staff – filed September 23, 2020
General Rate Application
- Electric – Public Input Sought for Electric Rate Hearing (Version française)
- Notice of Hearing (Version française) (July 5, 2019)
- Notice of Application (Version française) (December 19, 2018)
- Order No. UE19-01 – Consolidation Order – (February 4, 2019)
- News Release-Electricity Rates (released 2/28/2019) (Version française)
- Order No. UE19-02 (February 25, 2019)
- Order No. UE19-04 (June 24, 2019)
- Order No. UE19-05 – Intervener Order (July 4, 2019)
- Order No. UE19-06 – Intervener Order (Howard) (August 2, 2019)
- Order No. UE19-08 – (September 27, 2019)
- Order No. UE20-01 – (March 25, 2020)
- Order No. UE20-06 – (December 21, 2020)
2019 Weather Normalization Reserve Variables (WNR)
- Initial Correspondence between MECL and Grant Thornton – November 27, 2019
- Request for Information between MECL and Grant Thornton – December 11, 2019
- Grant Thornton Review of 2019 WNR Variables – December 18, 2019
- Order UE19-10 – Approval of 2019 WNR Variables – December 19, 2019
Updated Filing for Rates Effective March 1, 2020 and March 1, 2021
- Application for Schedule of Rates – January 31, 2020
- Additional Appendices and Schedules
- Appendix 1 Schedule of Proposed Rates – March 1, 2020 to February 22, 2022
- Appendix 2 Financial Statements
- Appendix 3 Monthly ECAM January 1, 2019 to December 31, 2021
- Appendix 4 Weather Normalization Reserve
- Appendix 8 – Estimate of Unrecovered Depreciation and Accumulated Reserve Variance for the CTGS
- Schedule 11-4 – Composition of per kWh Rates
- Schedule 13.1 Options – Two Year Amortization of Dorian & Offsetting 2019 RORA
- Section 13-2 Options – Balance of 2019 RORA to ECAM
- Section 13-3 Options – WNRA Not Funded
- Section 13.4 Options – WNRA Applied to Opening ECAM
- Section 13.5 Options – No Stabilization Adjustment to ECAM Base Rate
- Actual Financial Results as Required by Order UE19-08 – Section 13 – filed January 31, 2020
AMENDED Updated Filing for Rates Effective March 1, 2020 and March 1, 2021
- Amended Evidence for Schedule of Rates Effective March 1, 2020 and March 1, 2021 – filed February 10, 2020
- Amended Additional Appendices and Schedules
- Amended Appendix 1 Schedule of Proposed Rates – March 1, 2020 to February 28, 2022
- Amended Appendix 2 Financial Statements
- Amended Appendix 3 Monthly ECAM January 1, 2019 to December 31, 2021
- Amended Appendix 4 Weather Normalization Reserve
- Amended Appendix 8 – Estimate of Unrecovered Depreciation and Accumulated Reserve Variance for the CTGS
- Amended Schedule 11-4 – Composition of Total Energy Charge per kWh by Rate Class
- Amended Schedule 13.1 Options – Two Year Amortization of Dorian & Offsetting 2019 RORA
- Amended Section 13-2 Options – Balance of 2019 RORA to ECAM Balance
- Amended Section 13-3 Options – Balance of WNRA Not Refunded
- Amended Section 13.4 Options – Balance of WNRA Applied to Opening ECAM Balance
FURTHER AMENDED Updated Filing for Rates Effective March 1, 2020 and March 1, 2021
- Amended Evidence for Schedule of Rates Effective March 1, 2020 and March 1, 2021 – filed February 14, 2020
- Amended Additional Appendices and Schedules
- Amended Appendix 1 – Schedule of Proposed Rates – March 1, 2020 to February 28, 2022
- Amended Appendix 2 – Financial Statements
- Amended Appendix 3 – Monthly ECAM January 1, 2019 to December 31, 2021
- Amended Appendix 4 – Weather Normalization Reserve
- Amended Appendix 5 – Energy Supply Expenses – 2019 to 2021
- Amended Appendix 6 – Transmission and Distribution Expenses – 2019 to 2021
- Amended Appendix 7 – General and Administrative Expenses – 2019 to 2021
- Amended Appendix 8 – Estimate of Unrecovered Depreciation and Accumulated Reserve Variance for the CTGS
- Amended Appendix 9 – Financial Forecast Schedules – 2019 to 2021
- Amended Schedule 11-4 – Composition of Total Energy Charge per kWh by Rate Class
- Amended Section 13.1 – Options – Two Year Amortization of Dorian & Offsetting 2019 RORA
- Amended Section 13-2 – Options – Balance of 2019 RORA to ECAM Balance
- Amended Section 13-3 – Options – Balance of WNRA Not Refunded
- Amended Section 13.4 – Options – Balance of WNRA Applied to Opening ECAM Balance
- Amended Section 13.5 – Options – No Stabilization Adjustment to ECAM Base Rate
Notice – Maritime Electric seeks approval of electric rate increase – November 6, 2020
Applicant Exhibits:
- Exhibit M-1: General Rate Application (filed November 30, 2018)
- Exhibit M-1(b): Amendment to Appendix 11 of the General Rate Application (filed February 14, 2019)
- Exhibit M-2: Point Lepreau Cost Allocation Classification Study (filed April 27, 2017)
- Exhibit M-3: Charlottetown Thermal Generating Station Decommissioning Study prepared by GHD Limited (filed June 28, 2018) – Appendix 1
- Exhibit M-3(b): Charlottetown Thermal Generating Station Decommissioning Study prepared by GHD Limited (filed June 28, 2018) – Appendix 2
- Exhibit M-3(c): Charlottetown Thermal Generating Station Decommissioning Study prepared by GHD Limited (filed June 28, 2018) – Appendix 3
- Exhibit M-4: 2017 Depreciation Study prepared by Gannett Fleming (filed June 29, 2018)
- Exhibit M-5: 2017 Cost Allocation Study prepared by Chymko Consulting Ltd. (filed June 29, 2018)
- Exhibit M-6: Response to Interrogatories from Synapse re CTGS Decommissioning (November 16, 2018)
- Exhibit M-6(b): In-Confidence Filing Schedule 15 and 16
- Exhibit M-7: Correspondence from Maritime Electric re Request for Confidential Filing (January 29, 2019)
- Exhibit M-8: Response to Additional Interrogatories from Synapse re CTGS Decommissioning (February 1, 2019)
- Exhibit M-9: Response to Interrogatories from Multeese Consulting re Cost Allocation & Rate Design (February 1, 2019)
- Exhibit M-9(b): Response to Multeese Consulting IR-17
- Exhibit M-9(c): Response to Multeese Consulting IR-43
- Exhibit M-9(d): Response to Multeese Consulting IR-50
- Exhibit M-9(e): Response to Multeese Consulting IR-54
- Exhibit M-10: Response to Interrogatories from Laurence Booth re Return on Average Common Equity (February 1, 2019)
- Exhibit M-10(b): Response to Laurence Booth IR-2, IR-5 and IR-6
- Exhibit M-10(c): Response to Laurence Booth IR-8
- Exhibit M-11: Response to Interrogatories from Commission Staff (filed February 15, 2019)
- Exhibit M-11(b): Response to Commission Staff IR-2 – Attachment 1 – Summary of PEIEC Debt Collection
- Exhibit M-11(c): Response to Commission Staff IR-3 – Attachment 1 – Calculation of ECAM Base Rate
- Exhibit M-11(d): Response to Commission Staff IR-4 – Attachment 1 – Monthly WRNA and ROPA
- Exhibit M-11(e): Response to Commission Staff IR-7 – Attachment 1 & 2 – Post-2015 RORA
- Exhibit M-11(f): Response to Commission Staff IR-36 – Attachment 1 – Depreciation and Reserve Variance Forecasts
- Exhibit M-11(g): Response to Commission Staff IR-48 to IR-52 – Attachments
- Exhibit M-12: Correspondence from Maritime Electric re Request for Confidentiality pursuant to Rule 49 (filed February 12, 2019)
- Exhibit M-13: Confidential Response to Interrogatories from Multeese Consulting re Cost Allocation & Rate Design (filed March 1, 2019)
- Exhibit M-13(b): Response to Multeese Consulting IR-48 – Attachment 1 [CONFIDENTIAL]
- Exhibit M-13(c): Response to Multeese Consulting IR-48 – Attachment 2 [CONFIDENTIAL]
- Exhibit M-13(d): Response to Multeese Consulting IR-49 – Attachment 1 [CONFIDENTIAL]
- Exhibit M-13(e): Response to Multeese Consulting IR-49 – Attachment 2 [CONFIDENTIAL]
- Exhibit M-13(f): AMENDED Confidential Responses to Multeese Consulting IR-48 and IR-49 (filed April 5, 2019) [CONFIDENTIAL]
- Exhibit M-13(g): AMENDED Response to Multeese Consulting IR-48 – Attachment 1 [CONFIDENTIAL]
- Exhibit M-13(h): AMENDED Response to Multeese Consulting IR-48 Attachment 2 [CONFIDENTIAL]
- Exhibit M-13(i): AMENDED Response to Multeese Consulting IR-49 – Attachment 1 [CONFIDENTIAL]
- Exhibit M-13(j): AMENDED Response to Multeese Consulting IR-49 – Attachment 2 [CONFIDENTIAL]
- Exhibit M-14: Confidential Response to Interrogatories from Laurence Booth re Return on Average Common Equity (filed March 1, 2019) [CONFIDENTIAL]
- Exhibit M-15: Confidential Response to Interrogatories from Commission Staff (filed March 5, 2019) [CONFIDENTIAL] [NO ELECTRONIC COPY FILED]
- Exhibit M-16: Revised IR-45 Response to Interrogatories from Commission Staff (March 8, 2019)
- Exhibit M-17: Correspondence from Maritime Electric re Request for Confidentiality pursuant to Rule 49 (filed April 5, 2019)
- Exhibit M-18: Response to Additional Interrogatories from Multeese Consulting re Cost Allocation & Rate Design IRs-55-70 (filed April 5, 2019)
- Exhibit M-18(b): Response to Multeese Consulting IR-58
- Exhibit M-18(c): Response to Multeese Consulting IR-67 [Excel Spreadsheet]
- Exhibit M-18(d): Response to Confidential Interrogatories from Multeese Consulting (IRs 71-74) [CONFIDENETIAL]
- Exhibit M-18(e): Confidential Response to IR-59 from Multeese (April 11, 2019) [CONFIDENTIAL]
- Exhibit M-19: Data requests from Concentric Energy Advisors to Laurence Booth (filed April 23, 2019)
- Exhibit M-20: Response to Additional Interrogatories from Multeese Consulting re Cost Allocation & Rate Design IRs 75-76 (filed May 1, 2019)
- Exhibit M-21: Response to Additional Interrogatories from Commission Staff (filed May 24, 2019)
- Exhibit M-22: Rebuttal Testimony from Concentric Energy Advisors re Return on Average Common Equity (filed May 31, 2019)
- Exhibit M-23: Correspondence from Maritime Electric re comments on Multeese Consulting Report (filed May 31, 2019)
- Exhibit M-24: Response to report prepared by Synapse Energy Economics, Inc. re CTGS Decommissioning (filed June 5, 2019)
- Exhibit M-25 General Rate Application Revised Rates and Schedules (July 31, 2019)
- Exhibit M-26 Evidence from Dr. Laurence Booth dated May 2010 (filed August 7, 2019)
- Exhibit M-27 Commission Order UE10-03 dated July 12, 2010 (filed August 7, 2019)
- Exhibit M-28 Commission Order UE16-04R dated July 11, 2016 (filed August 7, 2019)
- Exhibit M-29 Interrogatory from Newfoundland Power 2019-2020 General Rate Application (NP-CA-059) (filed August 7, 2019)
- Exhibit M-30 Newfoundland & Labrador Board of Commissioners of Public Utilities Order No. P.U. 2(2019) (filed August 7, 2019)
- Exhibit M-31 Evidence from Dr. Laurence Booth dated September 25, 2018 (filed August 7, 2019)
- Exhibit M-32 Evidence from Dr. Laurence Booth dated November 2000 (filed August 7, 2019)
- Exhibit M-33 Response to Additional Interrogatories from Commission Staff IR-85 to IR-89 (filed August 15, 2019)
- Exhibit M-33(b) Response to IR-85(a) – Attachment 1
- Exhibit M-33(c) Response to IR-85(b) – Attachment 2
- Exhibit M-33(d) Response to IR-85(c) – Attachment 3
- Exhibit M-33(e) Response to IR-86 – Attachment 1
- Exhibit M-33(f) Response to IR-87 – Attachment 1
- Exhibit M-33(g) Response to IR-87 – Attachment 2
- Exhibit M-33(h) Response to IR-87 – Attachment 3
- Exhibit M-33(i) Response to IR-87 – Attachment 4
- Exhibit M-33(j) Response to IR-88 – Attachment 1
- Exhibit M-33(k) Response to IR-88 – Attachment 2
- Exhibit M-33(l) Response to IR-89 – Attachment 1
- Exhibit M-33(m) Updated Schedule 15-1
- Exhibit M-34 Response to Interrogatories from Commission Staff IR 90 to IR 96 – November 24, 2020
- Exhibit M-35 MECL Comments on Grant Thornton Report – November 24, 2020
- Exhibit M-36 MECL Response to PEI EC Comments on Grant Thornton Report – November 26, 2020
- Exhibit M-37 MECL Response to Interrogatories from Mr. Roger King – November 26, 2020
- Exhibit M-38 MECL Responses to Interrogatories from Mr. John te Raa – November 26, 2020
- Exhibit M-39 MECL Responses to Interrogatory IR-97 from Commission Staff – December 16, 2020
Commission Exhibits
- Exhibit C-1: Interrogatories from Synapse re CTGS Decommissioning (October 10, 2018)
- Exhibit C-2: Additional Interrogatories from Synapse re CTGS Decommissioning (January 2, 2019)
- Exhibit C-3: Interrogatories from Multeese Consulting re Cost Allocation & Rate Design (January 4, 2019)
- Exhibit C-4: Interrogatories from Laurence Booth re Return on Average Common Equity (January 7, 2019)
- Exhibit C-5: Interrogatories from Commission Staff re General Rate Application (January 17, 2019)
- Exhibit C-6: Additional Interrogatories from Multeese Consulting re Cost Allocation & Rate Design (March 19, 2019)
- Exhibit C-7: Confidential Additional Interrogatories from Multeese Consulting re Cost Allocation & Rate Design (March 19, 2019) (CONFIDENTIAL)
- Exhibit C-8: Report from Synapse Energy Economics, Inc. re CTGS Decommissioning (March 15, 2019)
- Exhibit C-8(b): Executed Acknowledgement of Expert’s Duty Form
- Exhibit C-8(c): Resume – Ben Havumaki
- Exhibit C-8(d): Resume – Erin Camp
- Exhibit C-8(e): Resume – Bob Fagan
- Exhibit C-8(f): Resume – Divita Bhandari
- Exhibit C-9: Report from Laurence Booth re Return on Average Common Equity (March 2019)
- Exhibit C-9(b): Executed Acknowledgement of Expert’s Duty Form
- Exhibit C-9(c): Appendix A – Resume of L. Booth (2019)
- Exhibit C-9(d): Appendix B – Estimation of the Market Risk Premium (2019)
- Exhibit C-9(e): Appendix C – Relative Risk Assessment for a Benchmark Utility (2019)
- Exhibit C-9(f): Appendix D – Discounted Cash Flow Estimates (2019)
- Exhibit C-9(g) Corrected Table of Contents (July 30, 2019)
- Exhibit C-10: Confidential Additional Interrogatories from Commission Staff re Executive Compensation (April 4, 2019) [CONFIDENTIAL]
- Exhibit C-11: Additional Interrogatories from Commission Staff re General Rate Application (April 11, 2019)
- Exhibit C-12: Additional Interrogatories from Multeese Consulting re Cost Allocation & Rate Design (April 18, 2019)
- Exhibit C-13: Laurence Booth Response to Data Requests from Concentric Energy Advisors (May 9, 2019)
- Exhibit C-13(b): Response to Concentric Data Request 4
- Exhibit C-13(c): Response to Concentric Data Request 6
- Exhibit C-13(d): Response to Concentric Data Request 13
- Exhibit C-14: Report from Multeese Consulting Incorporated re Cost Allocation & Rate Design (May 23, 2019)
- Exhibit C-14(b): Appendix MC-1
- Exhibit C-14(c): Appendix MC-2
- Exhibit C-14(d): Appendix MC-3
- Exhibit C-14(e): Appendix MC-4
- Exhibit C-14(f): Executed Acknowledgement of Expert’s Duty Form
- Exhibit C-15: Correspondence from Multeese Consulting Incorporated re Comments from MECL (June 10, 2019)
- Exhibit C-15(b): Adjustment to MECL Response to MCI Evidence
- Exhibit C-16: Sur-Rebuttal from Laurence Booth re Return on Average Common Equity (June 21, 2019)
- Exhibit C-17: Memorandum from Synapse re Additional Information Provided by MECL (July 3, 2019)
- Exhibit C-18 Power Point Presentation from Laurence Booth re Return on Average Common Equity (July 30, 2019)
- Exhibit C-19 Additional Interrogatories from Commission Staff re Revised Schedules and Rates (August 9, 2019)
- Exhibit C-20 Report from Grant Thornton on Updated Filing for Rates Effective March 1, 2020 and March 1, 2021
- Exhibit C-21 Interrogatories from Grant Thornton on Updated Filing for Rates Effective March 1, 2020 and March 1, 2021 and Responses from Maritime Electric to Grant Thornton
- Exhibit C-22 Interrogatories from Commission Staff re Updated Filing for Rates and the Grant Thornton Report
- Exhibit C-23 Interrogatories from Commission Staff (December 11, 2020)
Public Exhibits
- Exhibit P-1: Comments received from Roger King regarding Point Lepeau Cost Allocation Classification Study (August 7, 2017)
- Exhibit P-2: Comments received from Jeff L. regarding General Rate Application (December 11, 2018)
- Exhibit P-3: Comments received from Jonathan Oliver regarding General Rate Application (December 13, 2018)
- Exhibit P-4: Request to participate received from Roger King (January 21, 2019)
- Exhibit P-5: Correspondence from Jamie Fox regarding General Rate Application (February 22, 2019)
- Exhibit P-6: Correspondence to Jamie Fox regarding General Rate Application (February 28, 2019)
- Exhibit P-7: Comments received from Roger King regarding Rate Design and Cost Allocation (March 6, 2019)
- Exhibit P-7(b) Power Point Presentation from Roger King (July 30, 2019)
- Exhibit P-8: Comments received from Jonathan Crawford regarding Proposed Rate Increase (March 12, 2019)
- Exhibit P-9: Comments received from Joe Dumville regarding General Rate Application (July 7, 2019)
- Exhibit P-10: Comments received from Rachel Mears regarding Residential Second Block (July 7, 2019)
- Exhibit P-11: Comments received from Paul Smallman regarding Residential Second Block (July 7, 2019)
- Exhibit P-12: Comments received from Lucy Robson regarding General Rate Application (July 10, 2019)
- Exhibit P-13: Comments received from Marlene Hunt regarding General Rate Application (July 24, 2019)
- Exhibit P-14: Comments received from Kim Brenner regarding General Rate Application (July 24, 2019)
- Exhibit P-15: Comments received from Christina regarding General Rate Application (July 24, 2019)
- Exhibit P-16: Comments received from Marsha Empson regarding Proposed Rate Increase (July 25, 2019)
- Exhibit P-17: Comments received from Shawna Lannigan regarding Proposed Rate Increase (July 25, 2019)
- Exhibit P-18: Comments received from Susan Whelan regarding Proposed Rate Increase (July 25, 2019)
- Exhibit P-19 Comments received from Jillian MacIntyre regarding Rate Increase Feedback (July 26, 2019)
- Exhibit P-20 Comments received from Bob regarding Proposed Rate Increase (July 27, 2019)
- Exhibit P-21 Comments received from Darlene Gaudet regarding Proposed Rate Increase (July 27, 2019)
- Exhibit P-22 Comments received from Rob Fraser regarding Proposed Rate Increase (July 28, 2019)
- Exhibit P-23 Comments received from Spencer Matheson regarding General Rate Application (July 29, 2019)
- Exhibit P-24 Correspondence from David Lewis regarding General Rate Application (filed August 1, 2019)
- Exhibit P-25 Correspondence received from an Anonymous individual regarding Proposed Rate Increase (July 29, 2019)
- Exhibit P-26 Comments received from Darlene B Fleming regarding Proposed Rate Increase (August 5, 2019)
- Exhibit P-27 Comments received from Kaylee Campbell regarding Proposed Rate Increase (August 6, 2019)
- Exhibit P-28 Comments received from Doris Herring regarding Proposed Rate Increase (August 6, 2019)
- Exhibit P-29 Comments received from Gary A O MacKay regarding General Rate Application (August 9, 2019)
- Exhibit P-30 Comments received from John te Raa regarding General Rate Application (August 9, 2019)
- Exhibit P-31 Comments received from Terry Brauen regarding General Rate Application (August 10, 2019)
- Exhibit P-32 Submissions received from the Seafood Processors Association of Prince Edward Island (August 12, 2019)
- Exhibit P-33 Additional Comments received from John te Raa Regarding General Rate Application (August 13, 2019)
- Exhibit P-34 Comments received from Paul Izzard Regarding General Rate Application (August 13, 2019)
- Exhibit P-35 Post-Hearing Comments Submitted by Roger King (August 13, 2019)
- Exhibit P-36 Additional Comments received from John te Raa Regarding Lepreau Energy Costs (August 13, 2019)
- Exhibit P-37 Comments received from Tony Reddin, ECO-P.E.I. Energy Project Coordinator regarding General Rate Application (August 14, 2019)
- Exhibit P-38 Comments received from PEI Federation of Agriculture regarding General Rate Application (August 14, 2019)
- Exhibit P-39 Comments received from Edgar Dewar regarding Proposed Rate Changes (September 18, 2019)
- Exhibit P-40 Comments received from Mr. Roger King regarding General Rate Application – November 27, 2020
- Exhibit P-41 Comments received from Mr. John te Raa regarding General Rate Application – November 30, 2020
PEI Energy Corporation Exhibits
- Exhibit EC-1: Application for Intervener Status (June 27, 2019)
- Exhibit EC-2: Evidence filed on behalf of the PEI Energy Corporation (July 11, 2019)
- Exhibit EC-3 Comments filed by PEI Energy Corporation regarding Grant Thornton Report – November 20, 2020
Steven Howard, MLA and Opposition Shadow Critic for Transportation, Infrastructure and Energy
-
-
- Exhibit O-1 Application for Intervener Status (August 1, 2019)
- Exhibit O-2 Evidence filed on behalf of Stephen Howard, MLA and Opposition Shadow Critic for Transportation, Infrastructure and Energy (August 5, 2019)
- Exhibit O-3 Presentation made to IRAC by Stephen Howard (August 8, 2019)
- Exhibit O-4 BC Hydro Power Smart Evaluation of the Residential Inclining Block Rate dated June 2014 (filed August 8, 2019)
- Exhibit O-5 Closing submissions made to IRAC by Stephen Howard (August 9, 2019)
-
2020 Annual Capital Budget
- Notice of Application (September 25, 2019)
- Application and Evidence of Maritime Electric Company, Limited – August 23, 2019
- Overview of MECL’s Role in PEI Broadband Project – July 31, 2019
- MECL 2018 Capital Budget Variance Report – February 28, 2019
- Clarification Questions by Roger King – October 10, 2019
- MECL response to questions from Roger King re 2020 Annual Capital Budget (filed October 18, 2019)
- MECL Amendment to Figure 2 of the 2020 Annual Capital Budget Application (filed October 18, 2019)
- Interrogatories of Commission Staff re 2020 Annual Capital Budget (October 22, 2019)
- Comments from Roger King – October 25, 2019
- MECL response to Interrogatories from Commission Staff – (filed November 1, 2019)
- MECL Supplemental Information – PEI Broadband Project (filed December 5, 2019)
- Order No. UE19-09 – December 9, 2019
- MECL Interrogatories of Commission Staff re Broadband Provisional Request (filed February 11, 2020)
- 2020 Capital Budget Variance – February 26, 2021
COVID-19 Customer Support Program
2018 Bond Issue
- Debt Issue – First Bond Issuance
- Order No. UE18-06 – October 30, 2018
- Order No. UE18-11 – December 3, 2018
2019 Annual Capital Budget Application
- Application and Evidence of Maritime Electric Company, Limited – August 8, 2018
- Comments to Island Regulatory and Appeals Commission – Tony Reddin
- MECL – Response to Interrogatories from Commission – September 21, 2018
- Commission Interrogatories on MECL – September 11, 2018
- Roger King Submission to MECL – September 21, 2018
- Roger King Submission to Commission – September 30, 2018
- MECL Letter to IRAC re: Responses to Interrogatories of Roger King – September 28, 2018
- Public Notice Capital Budget 2019
- Additional Interrogatories by Commission Staff – October 12, 2018
- MECL Response to Additional Interrogatories from Commission Staff – November 2, 2018
- Roger King Additional Interrogatories to Commission – October 12, 2018
- Order No. UE18-09 – 2019 Capital Budget and 2017 Capital Budget Variances – November 26, 2018
- MECL 2019 Supplemental Budget Request Application for Line Rebuilds – July 31, 2019
- Order No. UE19-07 – Supplemental Capital Budget – 2019 – August 30, 2019
- 2019 Supplemental Budget Request – Application for Line Rebuilds – Make-Ready Work filed October 4, 2019
- Interrogatories of Commission Staff re 2019 Supplemental Budget Request for Eastlink Line Re-builds (October 23, 2019)
- MECL Letter to IRAC of Withdrawal of 2019 Supplemental Capital Budget Request Application – October 20, 2019
Other
- 06/29/2018 - 2017 Depreciation Study [PDF-5.7 MB]
- 06/29/2018 - 2017 Cost Allocation Study [PDF-2.8 MB]
- 06/28/2018 - Charlottetown Thermal Generating Station (CTGS) Decommissioning Study [PDF-41 MB]
- 05/18/2018 - Environmental Impact Statement (EIS): Proposed Borden-Carleton Transmission Line Project [PDF-5.8 MB]
- 10/31/2017 - Annual Update of the Weather Normalization Reserve Application
- 10/19/2017 - Interconnection Lease Agreement Application
- 04/27/2017 - Point Lepreau Cost Allocation Classification Study [PDF-210 KB]
- 08/09/2016 – Appendix M: 2014 Cost Allocation Study undertaken by Chymko Consulting [PDF-1.6 MB]
- 08/02/2016 – 2017 Capital Budget [PDF-270 KB]
- 07/08/2016 – OATT (Open Access Transmission Tariff) [PDF-4.9 MB]
- 02/05/2016 – Supplemental Information to 2016 General Rate Agreement [PDF-2.6 MB]
- 01/29/2016 – 2016 General Rate Agreement [PDF-497 KB]
- 10/28/2015 – General Rate Case Application and Evidence [PDF-13.8 MB]
- 09/30/2015 – Proposed Interconnection Upgrade Project Environmental Impact Assessment Volumes 1-2 [PDF-6.8 MB]
- 09/20/2015 – Proposed Interconnection Upgrade Project Environmental Impact Assessment Volumes 3-4 [PDF-44 MB]
- 07/30/2015 – 2016 Annual Capital Budget Application [PDF-276 KB]
- 07/23/2015 – Depreciation Study Application [PDF-4.2 MB]
- 06/25/2015 – Proposed Combustion Turbine Generator Application [PDF-877 KB]
- 06/03/2015 – Demand Side Management Plan 2015-2020 [PDF-674 KB]